CMU Robotics Innovation Center
Pittsburg, PA
Synopsis: Shrock Prefab provided the engineering, panel design, and prefabricated exterior bypass wall panels for this 3-story university lab/classroom complex
Our Scope :
- Fabricated and shipped approximately 2,705 LF of by-pass wall panels
- 45,910 SF of 5/8 National Gypsum eXp sheathing
- 45,910 SF of GCP Permabarrier NPS self-adhered AVB membrane
- CFS engineering and shop fabrication drawings
- Coordination with the engineer of record, architect, sub-contractor, and the general contractor








