New State Psychiatric Hospital
Northville, MI
Synopsis:
Shrock Prefab provided the engineering, panel design, and prefabricated exterior bypass wall panels for this 2-story hospital complex
Our Scope:
- Fabricated and shipped approximately 7,200 LF of by-pass wall panels
- 121,960 SF of 5/8 National Gypsum eXp sheathing
- 121,960 SF of Henry Airblock MR16 AVB
- 7,200 LF of wood parapet cap
- CFS engineering and shop fabrication drawings
- Coordination with the engineer of record, architect, sub-contractor, and the general contractor





